|
|
Process validation< Previous | Contents | Next > Sec. 820.75 Process validation.(a) Where the results of a process cannot be fully verified by subsequent inspection and test, the process shall be validated with a high degree of assurance and approved according to established procedures. The validation activities and results, including the date and signature of the individual(s) approving the validation and where appropriate the major equipment validated, shall be documented. (b) Each manufacturer shall establish and maintain procedures for monitoring and control of process parameters for validated processes to ensure that the specified requirements continue to be met.
(c) When changes or process deviations occur, the manufacturer shall review and evaluate the process and perform revalidation where appropriate. These activities shall be documented.
Rev 2006-11-18 12:03:32 -0700 |
||
|
For correct application of this information, see NOTE on Contents page |
Copyright © 2006 by Active Sensing, Inc. All rights reserved.